Turn Waste into Wealth
with MNRE Subsidy
Convert agricultural residue, cattle dung, urban organic waste into Biogas, BioCNG, or Electricity. Get Central Financial Assistance up to ₹10 Crore per project under Waste to Energy Programme.
Central Financial Assistance (CFA) Rates
As per MNRE guidelines dated 02.11.2022
| S.No. | Type of Project | Standard CFA Rate | Maximum CFA per Project |
|---|---|---|---|
| 1 | Biogas Plant | ₹0.25 Cr per 12,000 m³/day | ₹5.0 Cr |
| 2 | BioCNG / Enriched Biogas / CBG New Plant | ₹4.0 Cr per 4,800 kg/day | ₹10.0 Cr |
| 2a | BioCNG from Existing Biogas Plant Conversion only | ₹3.0 Cr per 4,800 kg/day | |
| 3 | Power from Biogas New Plant | ₹0.75 Cr / MW | ₹5.0 Cr |
| 3a | Power from Existing Biogas Plant Power unit only | ₹0.5 Cr / MW | |
| 4 | Power from Bio & Agro-industrial waste | ₹0.4 Cr / MW | ₹5.0 Cr |
| 5 | Biomass Gasifier (100% producer gas engine) | ₹15,000 per kWₑ | As per capacity |
| 5a | Biomass Gasifier (Dual fuel engine) | ₹2,500 per kWₑ | |
| 5b | Biomass Gasifier - Thermal | ₹2.0 Lakh per 300 kWₜₕ |
Eligible Projects & Subsidy Details
Complete CFA structure for all eligible project types
BioCNG / CBG
Biogas Plant
Power from Biogas
Biomass Gasifier
Agro-Industrial Waste
SATAT Initiative
Special Incentives
20% higher CFA for eligible categories
Special Category States
North-East Region, Sikkim, Himachal Pradesh, Uttarakhand, Jammu & Kashmir, Ladakh, Lakshadweep, Andaman & Nicobar Islands
+20% CFARegistered Gaushalas
Cattle dung based biomethanation plants set up by Gaushalas independently or through JV/partnerships
+20% CFAApplication Process
4 simple steps to avail Central Financial Assistance
Submit Proposal
Apply on BioURJA Portal (biourja.mnre.gov.in) before commissioning of the plant
In-Principle Approval
IREDA examines application. Ministry grants approval within 40 days of forwarding
Commissioning
24 months for WTE plants, 12 months for Gasifiers. SCADA system mandatory
Inspection & CFA Release
Performance inspection by SNA/NIBE/BTDC. CFA released based on PLF achieved
Performance Linked CFA Release
Need Expert Assistance?
Get end-to-end support for DPR preparation, application filing, IREDA coordination, and CFA disbursement follow-up.
Watch Our Detailed Video Guide
We explain this policy in detail on our channel Amplus Subsidy Solutions
Frequently Asked Questions
Everything you need to know about Waste to Energy Programme