Turn Waste into Wealth
with MNRE Subsidy

Convert agricultural residue, cattle dung, urban organic waste into Biogas, BioCNG, or Electricity. Get Central Financial Assistance up to ₹10 Crore per project under Waste to Energy Programme.

Implementing Agency: IREDA
Application Portal: BioURJA (biourja.mnre.gov.in)
In-principle Approval: Within 40 days
Scheme Validity: Phase-I: 2021-2026
₹10 Cr
Max CFA (BioCNG)
Per project
₹5 Cr
Max CFA (Biogas/Power)
Per project
20%
Extra for NE & Gaushala
Special Category States
858 Cr
Total Outlay
Phase-I (2021-26)

Central Financial Assistance (CFA) Rates

As per MNRE guidelines dated 02.11.2022

S.No. Type of Project Standard CFA Rate Maximum CFA per Project
1 Biogas Plant ₹0.25 Cr per 12,000 m³/day ₹5.0 Cr
2 BioCNG / Enriched Biogas / CBG New Plant ₹4.0 Cr per 4,800 kg/day ₹10.0 Cr
2a BioCNG from Existing Biogas Plant Conversion only ₹3.0 Cr per 4,800 kg/day
3 Power from Biogas New Plant ₹0.75 Cr / MW ₹5.0 Cr
3a Power from Existing Biogas Plant Power unit only ₹0.5 Cr / MW
4 Power from Bio & Agro-industrial waste ₹0.4 Cr / MW ₹5.0 Cr
5 Biomass Gasifier (100% producer gas engine) ₹15,000 per kWₑ As per capacity
5a Biomass Gasifier (Dual fuel engine) ₹2,500 per kWₑ
5b Biomass Gasifier - Thermal ₹2.0 Lakh per 300 kWₜₕ

Eligible Projects & Subsidy Details

Complete CFA structure for all eligible project types

BioCNG / CBG

₹4.0 Cr
per 4,800 kg/day (New Plant)
₹3.0 Cr
per 4,800 kg/day (Existing Plant)
Max CFA: ₹10 Crore/project
Special States: +20% CFA
Gaushala: +20% CFA

Biogas Plant

₹0.25 Cr
per 12,000 m³/day
Max CFA: ₹5 Crore/project
Commissioning: 24 months
Feedstock: Cattle dung, agri waste, FV waste

Power from Biogas

₹0.75 Cr
per MW (New Plant)
₹0.5 Cr
per MW (Existing Plant)
Max CFA: ₹5 Crore/project
Engine: 100% biogas engine

Biomass Gasifier

₹15,000/kWₑ
100% producer gas engine
₹2,500/kWₑ
Dual fuel engine
₹2.0 Lakh
per 300 kWₜₕ (Thermal)

Agro-Industrial Waste

₹0.4 Cr/MW
Power generation
Max CFA: ₹5 Crore/project
Not Eligible: MSW/RDF incineration

SATAT Initiative

50% Advance
CFA during construction
OMC purchase agreement
≥50% loan disbursed
Bank Guarantee required

Special Incentives

20% higher CFA for eligible categories

Special Category States

North-East Region, Sikkim, Himachal Pradesh, Uttarakhand, Jammu & Kashmir, Ladakh, Lakshadweep, Andaman & Nicobar Islands

+20% CFA

Registered Gaushalas

Cattle dung based biomethanation plants set up by Gaushalas independently or through JV/partnerships

+20% CFA

Application Process

4 simple steps to avail Central Financial Assistance

1

Submit Proposal

Apply on BioURJA Portal (biourja.mnre.gov.in) before commissioning of the plant

2

In-Principle Approval

IREDA examines application. Ministry grants approval within 40 days of forwarding

3

Commissioning

24 months for WTE plants, 12 months for Gasifiers. SCADA system mandatory

4

Inspection & CFA Release

Performance inspection by SNA/NIBE/BTDC. CFA released based on PLF achieved

Performance Linked CFA Release

≥80%
PLF Achieved
100% CFA
60-80%
PLF Achieved
80% CFA
50-60%
PLF Achieved
60% CFA
<50%
PLF Achieved
0% CFA

Need Expert Assistance?

Get end-to-end support for DPR preparation, application filing, IREDA coordination, and CFA disbursement follow-up.

Consult Now

Watch Our Detailed Video Guide

We explain this policy in detail on our channel Amplus Subsidy Solutions

Amplus Subsidy Solutions - 5,460+ Subscribers

Frequently Asked Questions

Everything you need to know about Waste to Energy Programme

How to apply for Waste to Energy subsidy?
Apply through BioURJA Portal (biourja.mnre.gov.in) before commissioning. Submit DPR, project documents, and forwarding letter. IREDA is the implementing agency.
Which projects are NOT eligible?
MSW/RDF to Power via Incineration, Gasification, Pyrolysis are NOT supported. Waste plastics, tires, polymer waste also not eligible.
Who is the implementing agency?
Indian Renewable Energy Development Agency Limited (IREDA) is the implementing agency for Waste to Energy Programme.
Can Gaushalas apply for subsidy?
Yes, registered Gaushalas get 20% higher CFA for cattle dung based biomethanation plants.
What is the CFA for BioCNG plants under SATAT?
BioCNG plants under SATAT with OMC agreement and ≥50% loan are eligible for 50% advance CFA during construction. Standard CFA: ₹4 Cr/4800 kg/day (new), ₹3 Cr/4800 kg/day (existing).
What is the scheme validity period?
Waste to Energy Programme is under Phase-I of National Bioenergy Programme from 01.04.2021 to 31.03.2026 with total outlay of ₹858 Crore.
Official Disclaimer: This is a summary of the Waste to Energy Programme guidelines issued by Ministry of New and Renewable Energy (MNRE), Government of India vide F.No. 300/2/2020-Waste To Energy dated 02.11.2022. For complete and updated information, please refer to the official MNRE website and BioURJA Portal.